**********
The wood laminate flooring has been installed throughout the old part of the house now. I am very pleased at how well it matches the existing paneling. We had to pack up almost everything in the house to get it out of the way, but we are finally getting it put back together.
The master bedroom closet is not finished yet. The painters should be here within the next week or so. There is still a lot of painting and staining to do.
***********
I have been working on arranging the furniture in the sewing room and the craft room, but only on paper. I drew them out on graph paper to scale, measured all my furniture, and cut out cardboard shapes so I can figure out where to put them.
Above: both rooms
The sewing room
The craft room
It will be a few weeks yet before I can actually move the furniture into the rooms, but it helps to know where things will fit. A few of the pieces I have not yet purchased, so I will be looking for the right size tables, armoire, etc. while the rooms are being finished.
**********