Thursday, August 29, 2013

Drywall dust--gotta love it!

**********

On Wednesday the long-awaited drywall (or sheetrock, take your pick) was finally delivered.
 

The boom truck unloaded it in about half an hour.


Sure beats carrying it a sheet at a time, huh?


Sliding sheets right into the upstairs door.


The only carrying required was from room to room.


Looking out the second floor window...


and out the first floor window.


All stacked and ready to go.


**********

So today the "rockers" showed up at 7:15 and got right to work. This is one of the upstairs bedrooms.
 

Don't step out the door--it's a long way down.  There will eventually be a deck out there.


The elevator shaft, looking down.


The upstairs full bath.


The other upstairs bedroom.


There will be an entertainment center built into this niche, for video games, etc.


I am looking forward to the railings going in--not very safe right now.


This is my new sewing room!


and the adjoining craft room.


The downstairs half-bath which includes the furnace closet. Next to it is the linen closet. On the far left will be a tankless water heater.


Below, the niche on the left is the wiring closet, and will have a desk in it for my laptop, maybe even a small TV.  Under the stairs on the right will be a door so that can be used for storage of bulky items.


The bottom of the elevator shaft.


In the master bedroom they walled up what used to be the closet, which is now part of the hallway.  They will eventually patch the paneling over the door.


This is the new master bedroom closet. It is a little bigger, which is great.


Tomorrow the corners will go in on the drywall, and they will wall in my new pantry.  They may work on the outer deck as well.  So stay tuned!

**********

No comments:

Post a Comment