Sunday, September 29, 2013

Built-ins

**********

The cupola arrived, and the roofers put the base up on the roof.  The carpenters will finish putting the top on next week. It looks smaller than it should right now, but once the top goes on, it wil look more proportionate.



And this is the weathervane:


*********
Today the cabinet maker finished installing the built-ins. After they are painted, the shelves and drawers will go in. 

Above:  the entertainment center in one of the upstairs bedrooms. This is set up for video games and a TV.


 This is the downstairs half-bath;  linen closet, vanity, and upper cabinet.


The four bookcases are in the craft room.  They will be lacquered, not painted; and have adjustable shelves.


 The storage area under the stairs has bead board covering it.


 This is the desk area under the upper staircase.  The door hides the electrical panel.


The vanity in the upper bathroom; the center cabinet will rest on the countertop in the center.

**********

The painters will be doing their thing this week; the cupola should be finished as well. I hope to see work in the pantry, too.  I am anxious to get that finished and have a place to put my groceries again.

**********