Sunday, June 16, 2013

Foundation walls going up!

Thursday and Friday the foundation walls went up. We're now waiting on the plumber to rough in. These photos show the process as it happened:












 
They were 23 blocks short of finishing.  Those should be delivered on Monday, and if the weather holds we hope to see more progress this week.

**********

These little (half-inch to 3/4-inch) butterflies are flocking to the moist uncovered soil. They are a pretty lavender color with their wings open.



 **********