**********
The workers arrived at 6:10 this morning and went right to work banging and sawing.
Doors and windows were framed in.
The wall panels going up.
and just like that, we have walls.
Ceiling joists being installed.
Internal wall framing in place. The craft room:
The half bath:
The elevator shaft and the master bedroom closet behind it.
The start of a staircase:
The sewing room:
Watch this space!
**********
No comments:
Post a Comment